星期四, 11 月 20, 2025

Auckland’s top transport priority should be second harbour crossing

获取您的 三位一体音频 玩家准备...
The existing harbour bridge is ageing and is at capacity meaning an additional harbour crossing will be needed sooner rather than later. 
  • By Simeon Brown, MP for Pakuranga

The Government’s recently announced proposal to spend more than $14 billion building light rail between the Auckland CBD and Auckland Airport is a colossal waste of money that won’t serve the needs of the commuters it would be built for.

Since Labour took power in 2017, they’ve gone round and round on light rail after promising to deliver something by 2021, only to have ended up with more metres of press release issued than any actual light rail.

Not only is $14b a lot of money for something that won’t benefit the majority of Aucklanders, but it’s also highly likely to see large cost overruns with some estimates indicating that it could be up to $24b.

The number one priority for Auckland right now should be a second harbour crossing. The existing harbour bridge is ageing and is at capacity meaning an additional harbour crossing will be needed sooner rather than later.

A second harbour crossing would ensure resilience in the transport network at one of New Zealand’s most critical points. We have already seen what happens when the Auckland Harbour Bridge is damaged, and the impact it has when this bridge can’t be used.

It’s clear the Government is less interested in proper long-term planning for Auckland and instead cares more about saving face as a result of a campaign pledge from 2017.

The problem with this is that Aucklanders are the ones who will end up footing the bill, with things like the Regional Fuel Tax and inevitable rates increases to cover budget blowouts continuing to hit us in the pocket.

Aucklanders are reasonable people and want to see their money invested in transport projects which help to grow our city, give us better connections, improved access to public transport as well as building the roads we need to keep people moving around our city such as the East West Link and Mill Road.

If National is elected back to Government next year, we will scrap this light rail project, focus on delivering a second harbour crossing and make real investments into a transport network that benefits all Aucklanders through improved connections and better public transport choices.

By clicking to accept for Times Online to be translated into Mandarin, you accept and acknowledge that it has been translated for your convenience using 3 rd party translation software. No automated translation is perfect, nor is it intended to replace human translators and are provided "as is." No warranty of any kind, either expressed or implied, is made as to the accuracy, reliability, or correctness of any translations made from English into Mandarin. Some content (such as images, videos etc.) may not be accurately translated due to the limitations of the translation software. The official text is the English version of the website. Any discrepancies or differences created in the translation are not binding and have no legal effect and should not be relied on by you for any decision-making purposes. If any questions arise related to the accuracy of the information contained in the translated website, refer to the English version of the website which is the official edited version.

点击同意将《时代在线》翻译成中文,即表示您接受并确认,该翻译是使用第三方软件为您方便起见而 提供的。请注意自动翻译并非完美无缺,也不旨在取代人工翻译,只能作为参考而已。对于英文到中文 的任何翻译的准确性、可靠性或正确性,我们不提供任何明示或暗示的保证。由于翻译软件的限制,某 些内容(如图片、视频等)可能无法准确翻译。   英文版本是本网站的官方正式文本。翻译中产生的任何差异或错误均不具有约束力,不具有法律效力, 您不应依赖由自动翻译软件生成的版本做出任何决策。如果对翻译后的网站中包含的信息的准确性有任 何疑问,请参阅本网站的官方编辑英文版本。

- 广告
- 广告

更多信息来自《泰晤士报在线

- 广告

最新

- 广告
- 广告